This slide shows the numerous steps required to take a prospective
area offshore from the conceptual stage, to actual leasing to
commercial production.
Other OCS areas presently off limits are well beyond that time
horizon even assuming the moratorium until 2012 is revised.
You just can not turn on the spigot and get gas when
the need arises. A considerable amount of planning is required.