AXPC Home

Previous Home Next

Slide22

Technology Helps Wells Continue Producing

This shallow gas well in northern Montana was "worked over." The jointed steel tubing was removed, the wellbore was cleaned of mud, scale and frac sand debris and a new string of corrosion resistant, small diameter coiled tubing was installed in less than one day. The work doubled the gas rate from the well, extending the productive life and reserve recovery.

Source: Noble Energy, Inc.