Technology Helps Wells Continue Producing
This shallow gas well in northern Montana was "worked
over." The jointed steel tubing was removed, the
wellbore was cleaned of mud, scale and frac sand debris
and a new string of corrosion resistant, small diameter
coiled tubing was installed in less than one day. The
work doubled the gas rate from the well, extending the
productive life and reserve recovery.
Source: Noble Energy, Inc.